93 f-2 frame swap
ok guys it took me about 6 hours but i got just about everything swaped over to the new frame. all i have to do is a head gasket, rings and clean up the valves and im soon going to be ridding.....
this is how i started at about 9 am

switch over the rear lite and took off a few more things but still have a long way to go..

got got the pasenger pegs on and the whole wire harness swithed over and the dash

and here is were I stoped for the day i got a rolling chassis with a title
and i am half way done.

I just cant wait to ride it.
this is how i started at about 9 am

switch over the rear lite and took off a few more things but still have a long way to go..

got got the pasenger pegs on and the whole wire harness swithed over and the dash

and here is were I stoped for the day i got a rolling chassis with a title

I just cant wait to ride it.
Thread
Thread Starter
Forum
Replies
Last Post




