CBR 600F2 1991 - 1994 CBR 600F2

'93 F2 Multiple Projects 4 days

Thread Tools
 
Search this Thread
 
  #11  
Old 08-26-2011, 12:27 AM
TooBroke0029's Avatar
Senior Member
Join Date: Apr 2010
Posts: 366
Likes: 0
Received 0 Likes on 0 Posts
Default

God work bro, its good your getting after it keep posting pics too. Paint prep takes alot of time if there not brand new fairings. Any defect in the fairings with proper body work will pop out in the paint and at that point its too late. Best of luck to you.
 
  #12  
Old 08-26-2011, 02:19 AM
Dylan4380's Avatar
Junior Member
Join Date: Dec 2010
Location: Gardner, Kansas
Posts: 31
Likes: 0
Received 0 Likes on 0 Posts
Default

Yeah my first set of fairings were terrible and I had to redo my tank like 4 times it kept spider webbing
 
  #13  
Old 08-26-2011, 01:34 PM
madhaxor_3's Avatar
Junior Member
Thread Starter
Join Date: Sep 2009
Location: San Diego
Posts: 24
Likes: 0
Received 0 Likes on 0 Posts
Default

Update sort of: My internet is down and I hate using my phone because it runs so slow. engine going back together, base/frame/cover/wheel colors picked, brackets made for seat ready to install.

According to provider "internet will be back up in 2-4 hours". yea ok we'll see about that one...
 
  #14  
Old 08-26-2011, 09:52 PM
madhaxor_3's Avatar
Junior Member
Thread Starter
Join Date: Sep 2009
Location: San Diego
Posts: 24
Likes: 0
Received 0 Likes on 0 Posts
Default

Internet is back, so it's update time.

Sometime around hour 68 or 96 and this is where I'm at.

Project 1: Engine is back together and ready to be fitted to the frame.
~55% complete

Project 2: Mounting will be done tomorrow at my buddies shop, as will the final milling of the spacers and carrier.
~30% complete

Project 3: Frame has been painted (slightly lighter than the tank and a gloss finish instead of flat), rim has also been painted, but the tire is still to be mounted. A design has also been created for the fairings, but it is too detailed and won't get finished by the deadline...so it may stay white for a bit longer?????
~30% complete

Project 4: Tuning will start when the bike is fully assembled
~90% complete

Project 5: .....why did I even try to do 5 projects. The quick release has fallen by the wayside for now, but there is hope if EVERYTHING comes together smoothly tonight.
~10% complete

Overall I'd say I am around 40% complete. I expect tuning and the wheel swap to take the majority of the day tomorrow, and I will hopefully be riding the completed first ever wrenchfest bike on Sunday.

Pic1: valve cover, silverish color

Pic2: 900rr rim, same color as valve cover

Pic3: F3 swingarm, now smokin joes purple powdercoat, maybe change to gunmetal color.

Pic4: frame, gunmetal color

Order of pics may be messed up, it should be easy to tell what each piece is.

I'll have the names/paint codes listed later, maybe when everything is complete.
 
Attached Thumbnails '93 F2 Multiple Projects 4 days-dsc01100.jpg   '93 F2 Multiple Projects 4 days-dsc01104.jpg   '93 F2 Multiple Projects 4 days-dsc01109.jpg   '93 F2 Multiple Projects 4 days-dsc01101_fix.jpg  

Last edited by madhaxor_3; 08-26-2011 at 10:05 PM.
  #15  
Old 08-27-2011, 11:13 PM
TooBroke0029's Avatar
Senior Member
Join Date: Apr 2010
Posts: 366
Likes: 0
Received 0 Likes on 0 Posts
Default

if u dont mknd me asking how much is it costing for the milling of the carrier and the spacers?
 
  #16  
Old 08-28-2011, 01:25 AM
madhaxor_3's Avatar
Junior Member
Thread Starter
Join Date: Sep 2009
Location: San Diego
Posts: 24
Likes: 0
Received 0 Likes on 0 Posts
Default

So my self appointed project time limit has lapsed. I did not finish all of the projects, but I'm not sure I can count most of today in the original project time line because of 2 minor reasons:

1) a new project emerged today, a surprise suspension modification ('98 F3 rear suspension with remote rez happy times)

2) the outside temperature topped out at just over 100*(F) and I had to seek out a cooler environment for a good portion of the day.

All excuses aside, wrenchfest 2011 has been full of enjoyment. I was hoping to get at least 1 day of riding before my vacation is over, but I guess I will just have to use the extra day for finishing up the small touches and testing.

I will post up some pics of the progress, changes, and final outcome. Hope at least one person, besides me, learned something. If anyone has any question feel free to post so others can learn too or PM me if you want a really detailed answer. Also I can provide pics of specific things if needed.

Pics of new suspension... you can sort of see it somewhere in the mess
 
Attached Thumbnails '93 F2 Multiple Projects 4 days-dsc01131.jpg   '93 F2 Multiple Projects 4 days-dsc01132.jpg  
  #17  
Old 08-28-2011, 01:42 AM
madhaxor_3's Avatar
Junior Member
Thread Starter
Join Date: Sep 2009
Location: San Diego
Posts: 24
Likes: 0
Received 0 Likes on 0 Posts
Default

toobroke: I will try to get costs of parts and labor for everything that I did up on Monday or Tuesday.
 
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
montrese04
F2 For Sale / Trade / Wanted
2
04-13-2015 10:01 PM
Kuroshio
Sights 'N Sounds
13
11-15-2013 11:45 PM
Triscuit
General Tech
7
08-16-2012 03:10 PM
Shocktroop
Off Topic
10
04-16-2007 12:09 PM
95camaro01f4i
Off Topic
6
04-14-2007 03:06 PM



Quick Reply: '93 F2 Multiple Projects 4 days



All times are GMT -5. The time now is 06:15 PM.