Installing Power Commander 5 on my bike- how??
So..i went out to the garage to install my new PC5 on my CBR1000RR-06 and got stuck when trying, due to bad black and white pictures in the installation guide.
It says: "This bike has a set of upper and lower injectors. Verify you connect the PCV harness to the lower set of injectors at the throttle bodies".
From what i can see, there are just one row of injectors, not one upper and one lower...or?

Then another issue appeared when i was about to connect the plugs to each injector. I says in the instructions:
"Connect the pair of PCV leads with ORANGE colored wires to the far left cylinder (cylinder#1) and continue to the right."
How can i determine what connector to use for what injector, when the PC5 harness looks like this?
The orange one i understand, but what about the others..in what order should they attach from left to right?
It says: "This bike has a set of upper and lower injectors. Verify you connect the PCV harness to the lower set of injectors at the throttle bodies".
From what i can see, there are just one row of injectors, not one upper and one lower...or?
Then another issue appeared when i was about to connect the plugs to each injector. I says in the instructions:
"Connect the pair of PCV leads with ORANGE colored wires to the far left cylinder (cylinder#1) and continue to the right."
How can i determine what connector to use for what injector, when the PC5 harness looks like this?
The orange one i understand, but what about the others..in what order should they attach from left to right?
Thread
Thread Starter
Forum
Replies
Last Post



